Minneapolis Public Schools
Multiple Locations
IN BRIEF:
Projects ranging from asset preservation to system upgrades included work at the following locations:
- Loring Elementary School
- Emerson Elementary School
- Sanford Elementary School
THE CHALLENGE:
Working on several schools in the district, WAI Continuum was asked to address a wide variety of challenges, unique to each location. Primary design issues to be addressed included:
- Asset preservation
- Roof replacement
- Tuckpointing and brick cleaning
- Window replacement
- Interior remodeling
- Wall repair & repainting
- Floor repair & replacement
- Ceiling replacement
- Upgrades for ADA compliance
- HVAC, electrical, ire & life safety upgrades
- Gymnasium floor replacement
- Classroom, multi-purpose room & auditorium renovations
THE SOLUTION:
In light of the numerous simultaneous projects involved, project work and scheduling involved sensitive consideration and design implementation around:
- Scheduling for funding availability
- Occupied construction - working around school breaks and/ or daily school sessions
- Multiple bid packages for scheduling/funding/scope considerations
- Code compliance for a variety of system upgrades