Offices in Minnesota and Florida

Minneapolis Public Schools

Multiple Locations

IN BRIEF:

Projects ranging from asset preservation to system upgrades included work at the following locations:

  •  Loring Elementary School
  •  Emerson Elementary School
  •  Sanford Elementary School

THE CHALLENGE:

Working on several schools in the district, WAI Continuum was asked to address a wide variety of challenges, unique to each location. Primary design issues to be addressed included:

  •  Asset preservation
    •   Roof replacement
    •  Tuckpointing and brick cleaning
    •  Window replacement
  •  Interior remodeling
    •  Wall repair & repainting
    •  Floor repair & replacement
    •  Ceiling replacement
  •  Upgrades for ADA compliance
  •  HVAC, electrical, ire & life safety upgrades
  •  Gymnasium floor replacement
  •  Classroom, multi-purpose room & auditorium renovations

THE SOLUTION:

In light of the numerous simultaneous projects involved, project work and scheduling involved sensitive consideration and design implementation around:

  •  Scheduling for funding availability
  •  Occupied construction - working around school breaks and/ or daily school sessions
  •  Multiple bid packages for scheduling/funding/scope considerations
  •  Code compliance for a variety of system upgrades